![]() |
![]() |
|
BNL: Departments | Science | ES&H | Newsroom | Administration | Visitors | Directory |
|
Site Details Introduction to Triple Axis Spectrometry Publications & Technical Reports Monochromator Shield Installation Other Information |
USJ-TAX - US-Japan Triple Axis SpectrometerMonochromator ShieldThe monochromator shield was delivered January 30-31, 2008.
Delivery occurred after test assembly and operational testing of all three motion systems by Oak Ridge Tool-Engineering.
The one item that remains to be shipped is the motor / gear system for rotating the exit port about the monochromator axis. During testing at ORT-E, this assembly broke, partly due to supplier error in fabrication of an adaptor flange, and partly due to test acceleration that is much larger than that for normal operation.
Last Modified: Wednesday, 05-Mar-2008 14:20:04 EST
|