Photo Gallery of HYSPEC Construction Images

  • HYSPEC testing and commissioning - 2012

  • Detector Vessel installation - 2011

  • Monochromator drum and primary beamline (guides, choppers) installation - 2010

  • HYSPEC monochromator drum assembly at the Keller Technology Corporation (item  KTC SO 19207) - July, 2010

  • Primary beamline and shielding installation - June, 2010

Top of Page

  • HYSPEC shutter insert installation - October, 2008

  • Rebar installation for beamline 14, January - February, 2007

100_2052.jpg (722093 bytes)100_2051.jpg (723178 bytes)100_2050.jpg (743948 bytes)100_2049.jpg (747187 bytes) 

  • Core Vessel Insert installation - November, 2006

PB110004.JPG (468130 bytes) PB110014.JPG (430345 bytes)

  • Bulk Shield Insert installed - September, 2006

bsi07.JPG (143353 bytes)bsi06.JPG (151336 bytes)bsi08.JPG (227290 bytes)bsi05.JPG (194984 bytes)bsi04.JPG (195920 bytes)bsi03.JPG (212762 bytes)bsi02.JPG (183943 bytes)bsi01.JPG (194786 bytes)